|
Welcome to the January edition of the TDS Midlands newsletter. We hope you have had a successful start to 2010 and look forward to hearing from you throughout the year when you require our assistance. Thanks for you time and the very best of luck for 2010 and beyond.
TDS complete two prestige projects in Q4 2009:
Castle House - Elephant & Castle, London
TDS were employed to engage in design, development and 3D modelling in order to enable the accurate manufacture and installation of the complex, elliptical, 9 meter diameter wind turbines which generate both heat and electricity for the building and also provide an iconic feature.
With thanks to OMC Engineering.
   
Leicester Tigers Rugby Stadium
TDS were employed to supply GA and fabrication details for miscellaneous architectural metalwork for the phased redevelopment scheme designed to increase the capacity of an existing Premiership Rugby Club ground from 17,000 to over 30,000 spectators.
With thanks to Adey Steel.
 

|